Interference with Wetlands and Alterations to Watercourses and Shorelines
Small Scale
$500
Interference with Wetlands and Alterations to Watercourses and Shorelines
Medium Scale
$1000
Interference with Wetlands and Alterations to Watercourses and Shorelines
Large Scale
$4000
Interference with Wetlands and Alterations to Watercourses and Shorelines
Major Scale
$7000
Permission for Minor Works
$100
$150 with site visit
Permit Revisions
Small scale: 25% of current fee
Others: 50% of current fee
Property Information
Fee
Solicitor/Realtor/Property Inquiry
$250
NOTES
The application fee must be paid at the time of filing an application. A permit will not be issued unless the application fee has been submitted.
CVC reserves the right to modify or adjust fees should the review require a substantially greater, or lower, level of review and/or assessment.
All permits are issued for two years. Permit extensions and/or renewals will not be granted. However, applicants may re-apply for re-issuance of a new permit for the original approved works in accordance with the most recent technical requirements.
For Permits associated with “Unauthorized Works” or a “Violation”, the fee will be double the applicable application fee.
DEFINITIONS
Small Scale: an application is determined to be “Small Scale” where no technical studies are required.
Medium Scale: an application is determined to be “Medium Scale” where limited technical studies are required such as a scoped Environmental Impact Study (EIS).
Large Scale: an application is determined to be “Large Scale” where technical studies beyond a scoped EIS (e.g. water resources, geotechnical) are required.
Major Scale: an application is determined to be “Major Scale” where a number of technical studies are required (hydraulic analysis, storm water management, geotechnical, etc.).
Examples would be new bridge construction, municipal roads, golf courses.
$2650 per net ha
50% at first submission
50% at draft approval
Golf Courses
$10,000
Aggregate Operations
$50,000
Effective September 12, 2008
NOTES
The application fee must be paid at the time of filing an application and/or within 30 days of CVC notification in writing. For outstanding payments, CVC may place the application on hold upon review until satisfactory arrangements are established.
When processing and reviewing consolidated applications (e.g. subdivision/ZBA/OPA applications), the highest rate of fees will apply.
Separate fees will apply for the processing of CVC permit approvals, with the exception of Subdivision applications.
CVC reserves the right to adjust fees should the review require a substantially greater or lower level of review including applicant-driven revisions to an approved plan/application.
CVC reserves the right to reassess fee requirements after two years of receipt of the application, based on timing and receipt of required technical information.
DEFINITIONS
Minor: an application is determined to be “Minor” where no technical studies are required, or only a scoped Environmental Impact Study (EIS) is required.
Major: an application is determined to be “Major” where technical studies beyond a scoped EIS (e.g. stormwater management, geotechnical) are required.